Elizabeth Line TVS MaintenanceElizabeth Line TVS Maintenance

Project name
Provision of full preventative & corrective Maintenance and 24h On- call service for fast response in the Maintenance of the Tunnel Ventilation System of Elizabeth line Railway
Year
2021
Location
UK
Industry category
Rail Tunnel Infrastructure
Fan model
ZVR 1-28-200/8, ZVR 1-25-300/6, ZVR 1-25-185/6 , ZVR 1-25-185/8 , ZVR 1-25-250/6, ZVR 1-25-280/6, ZVR 1-25-300/6, ZVR 1-25-315/6, ZVR 1-28-280/8, ZVR 1-28-355/6, ZVR 1-28-450/6
Fan type
100% Reversible Axial fans
Fan impeller diameter
2500 &2800 mm
Quantity
The maintenance includes 48 Axial fans plus MSFD dampers, Noise attenuators, Transition pieces, UPE Grilles, Adit Meshes and power and control cabinets.
Total installed power
12535 kW

PROJECT DESCRIPTION

The project: A new line for London
The Elizabeth line will stretch more than 60 miles from Reading and Heathrow in the west through central tunnels across to Shenfield and Abbey Wood in the east.
The new railway – currently being built by Crossrail Ltd – will stop at 41 accessible stations, 10 newly built and 30 newly upgraded, and is expected to serve around 200 million people each year.

Scope of Supply: Zitrón’s scope of works for the project compromises originally the design, delivery, of the 100% reversible Axial ventilation  fans. Now, the maintenance is a turn key project including:

  • Managing the permits with all the parties for granting access on sites
  • Planification of the maintenance schedule and coordination with the different parties involved in the construction and railway activities
  • Providing a highly skilled team of specialized technicians for electro mechanical maintenance of the full TVS system
  • Effective maintenance of 48 axial fans and dampers, noise attenuators, transition pieces, UPE Grilles, Adit Meshes, VSD cabinets, MCC Cabinets.
  • 24 Hour On Call service for immediate reaction in case of high and critical alarms in the Network

The site team works on night shifts and in a very restrictive time frame, so they need to be very specialized in order to achieve the objectives within the shift.